Technip Offshore

Oil & Gas

PROJECT  | Design, manufacture and testing of a 600 tonne capacity double sheave block

Customer: Technip Offshore

Project: Otway Gas Project

Required: A block for the lifting of a topside production platform, suitable for offshore conditions.

Solution: Nobles engineers designed, manufactured and tested a massive 600 tonne capacity double sheave block.

Back To Projects
HAVE A PROJECT IN MIND?

Contact us to discuss.