John Holland Group
Engineering Construction
PROJECT | Abbot Point Shiploader
Customer: John Holland Group
Project: Abbot Point Shiploader
Required: Hoisting & boom ropes and load cell pins for a shiploader with a 7200 tonne per hour capacity
Solution: Nobles worked closely with the lead engineers to determine the optimal rope specifications for the almost 1,000m of rope required, and custom engineered a variety of load cell pins, including ones up to 220mm in diameter.
HAVE A PROJECT IN MIND?
Contact us to discuss.