John Holland Group

Engineering Construction

PROJECT  | Abbot Point Shiploader

Customer: John Holland Group

Project: Abbot Point Shiploader

Required: Hoisting & boom ropes and load cell pins for a shiploader with a 7200 tonne per hour capacity

Solution: Nobles worked closely with the lead engineers to determine the optimal rope specifications for the almost 1,000m of rope required, and custom engineered a variety of load cell pins, including ones up to 220mm in diameter.

Back To Projects
HAVE A PROJECT IN MIND?

Contact us to discuss.