BHP Billiton & Boom Logistics
Cranes & Lifting
PROJECT | Pilbara Rail Infrastructure
Customer: BHP Billiton & Boom Logistics
Project: Pilbara Rail Infrastructure
Required: A simple and safe rigging system to move 178 tonne locomotive rolling stock that required minimal labour to set up due to the remote location.
Solution: Nobles proposed and supplied sophisticated synthetic slings with Dyneema, providing a very high strength, low stretch sling system that only required a single person to handle on site.
HAVE A PROJECT IN MIND?
Contact us to discuss.