BHP Billiton & Boom Logistics

Cranes & Lifting

PROJECT  | Pilbara Rail Infrastructure

Customer: BHP Billiton & Boom Logistics

Project: Pilbara Rail Infrastructure

Required: A simple and safe rigging system to move 178 tonne locomotive rolling stock that required minimal labour to set up due to the remote location.

Solution: Nobles proposed and supplied sophisticated synthetic slings with Dyneema, providing a very high strength, low stretch sling system that only required a single person to handle on site.

Back To Projects
HAVE A PROJECT IN MIND?

Contact us to discuss.